SDOT will close the Fremont Bridge on the nights of March 14th and 15th for repair work. “Bridge crews will repair a damaged center lock, the device that keeps the two leaves of the bridge firmly fastened down when it is not opening for marine traffic,” SDOT explains. The bridge will be closed to vehicles, pedestrians, and bicyclists from 11 p.m. Saturday, March 14, until 5 a.m. Sunday, March 15, in time for the St. Patrick’s Day Dash. During the repair work SDOT will provide shuttle services for pedestrians and bicyclists.
March 2
Fremont Bridge to close for two nights
Uncategorized
2 comments